Interior Painting
Walls, ceilings, trim, doors and cabinets — with careful prep, clean lines and dust control.
Learn moreSoft boards, wobbly rails and rotted framing fixed — or rebuilt from the joists up when repair no longer makes sense.
Every home and project is different, so these are typical ranges to help you plan — you always get a free written price after we see the job, never a verbal guess.
Combine repairs with staining and we'll seal and protect the new wood as part of the same project — ask about bundle pricing.

The honest answer depends on what is underneath. If the posts, beams and joists are still sound, replacing the decking and railings gets you a deck that feels brand new for a fraction of the cost of a rebuild. If the framing is rotted, undersized, or was never flashed properly where it attaches to the house, patching the top is throwing money at a structural problem.
We will look at it, tell you straight which situation you are in, and price both options if it is a close call. A quick field test: if a screwdriver sinks into a joist or post with light pressure, that member is gone.
Living on Tellico Lake, Fort Loudoun or Watts Bar means your dock takes constant moisture, sun and traffic. Walkway boards are usually first to go — they split, cup and get slick. We replace decking with new pressure treated lumber, check the framing and supports underneath while it is open, and get the run flat and solid all the way out to the slip.
Some things should not wait: a railing that moves when you lean on it, decking that flexes or feels spongy underfoot, visible rot where the deck meets the house, rusted or missing joist hangers, and stair treads that have pulled loose. Those are the failures that hurt people.
New pressure treated lumber needs to dry before it will accept stain — often several weeks to a few months depending on the season. We will tell you when your deck is ready and can come back to clean, stain and seal it so the whole surface matches — see our deck staining page for the full process, or ask us to just repair the deck now and quote the staining separately.
Most of our dock and lakefront deck calls come from the lake communities — Tellico Village and Loudon on Tellico Lake, and the neighborhoods along Fort Loudoun and Watts Bar near Lenoir City. Docks and lakefront decks there take the hardest beating from constant moisture and sun, which is exactly the kind of failing walkway boards and soft framing we deal with every week.
In Farragut and Hardin Valley, most of what we see is elevated decks off the back of newer homes — railings that have started to wobble, ledger boards that were never flashed right where they meet the house, and decking that cups and splits after a few East Tennessee summers. Around Knoxville, Powell and Maryville we run into everything from older decks that need a full rebuild to newer ones that just need a handful of boards and a railing tightened up. We also handle deck and dock repairs in Oak Ridge and the surrounding area — see our full list of service areas if your neighborhood isn't named here.
Walls, ceilings, trim, doors and cabinets — with careful prep, clean lines and dust control.
Learn moreSiding, brick, stucco, trim and shutters, prepped and coated to handle East Tennessee weather.
Learn moreWood fence cleaning, staining and sealing to bring back color and slow down weathering.
Learn moreWood deck cleaning, staining and sealing that stands up to foot traffic and weather.
Learn moreDecks, driveways, sidewalks, siding and fences washed clean — on its own or before painting.
Learn moreApp-controlled roofline lighting for holidays, game days and everyday curb appeal — no ladders, ever.
Learn morePush a screwdriver or awl into the joists, beams and posts, especially where they meet the house and where they touch the ground. If it sinks in easily, or the wood is dark, soft and crumbly, that member needs to be replaced. Springy or spongy decking is another sign the structure below is failing.
We can usually get close on lumber type and dimension, but new wood will look different from weathered wood for a while. If matching matters, the clean solution is to replace the boards and then clean and stain the entire deck once the new lumber has dried.
It depends entirely on how much needs replacing and whether the framing is involved. Swapping a handful of boards is a small job. Reframing a deck is not. We come out, inspect it, and give you a free written estimate before anything starts.
Yes. We rebuild decks and dock walkways from the framing up when repair no longer makes financial sense, using pressure treated lumber and galvanized hardware.
Pressure treated lumber has to dry out before stain will penetrate. Depending on the season that is usually a few weeks to a few months. Stain it too early and it will not absorb or last.
Send a few details and we will get back to you the same day, most days — or call (865) 291-7089 now.