Learn moreTellico Village has its own rules and its own conditions — an Architectural Control Committee that has to approve your exterior colors, and nearly a thousand private docks taking a beating from sun and water. Here is how we work around both.

Tellico Village is not a place where you can pick a color on Saturday and start painting on Sunday. The Property Owners Association runs an Architectural Control Committee, and its published guidance is explicit: “Permits are required for additions, painting a house, and other actions that will change the exterior appearance.” That covers exterior painting and siding changes, and it also covers boat docks and seawalls.
In practice that means the paperwork has to lead the paintwork. The ACC meets twice a month — normally the first and third Thursdays at 9am — and completed permit applications must be in at least ten days before the meeting. Color chips and samples go in with the application. If you submit the day after a meeting, you are realistically three to four weeks from an approval.
We are used to this. We will help you pull together what the committee wants to see — the color selections, what is being changed, and what is staying the same — and we will schedule the work around your approval date rather than turning up and hoping. If your plan is a like-for-like refresh in your existing colors, say so early; that is a much simpler conversation than a color change.
Tellico Village sits on the water, and the dock stock is substantial — roughly 995 private docks plus around 855 community slips, according to Life on Tellico Lake. A dock is the hardest-working structure most homeowners own. It takes direct sun off the water, spends its life in humidity, and the walking surface grows algae that makes it slick long before the boards actually fail.
Waterfront work has a second layer of permitting on top of the POA. Construction and modification of docks and shoreline structures on TVA reservoirs generally requires a TVA Section 26a permit, and new residential docks are limited in size — guidance from LMH Waterfront puts the residential cap at 1,000 square feet. Straightforward maintenance — replacing worn decking boards in kind, tightening framing, fixing a railing — is a different animal from enlarging or rebuilding a structure. If your project sits in the grey area between the two, we will tell you before we start rather than halfway through.
Dock walkways that have gone soft or slick. Deck boards cupping after years of sun. Exterior repaints where the south and west elevations have faded ahead of the rest of the house. Fence staining. And pressure washing — done at a pressure that cleans the surface without driving water into it.
Tellico Village is a short run from Lenoir City and Loudon, so it is easy for us to get out for an estimate without turning it into an expedition. Call (865) 291-7089 and we will come and look at the actual project.
Walls, ceilings, trim, doors and cabinets — with careful prep, clean lines and dust control.
Learn moreSiding, brick, stucco, trim and shutters, prepped and coated to handle East Tennessee weather.
Learn moreBoard replacement, joist and framing repair, railing fixes, plus full deck and dock rebuilds.
Learn moreWood fence cleaning, staining and sealing to bring back color and slow down weathering.
Learn moreDecks, driveways, sidewalks, siding and fences washed clean — on its own or before painting.
Learn moreYes. The Tellico Village POA Architectural Control Committee states that permits are required for painting a house and other actions that change the exterior appearance, including siding changes, docks and seawalls. Color chips and samples are submitted with the application. Confirm the current requirements with the ACC Permit Division on 865-458-5408 extension 4117.
The committee normally meets on the first and third Thursdays of the month at 9am, and completed applications must be received at least ten days before the meeting. Depending on when you submit, plan on roughly three to four weeks before you have an answer. We schedule the work around that rather than assuming it.
No. The ACC guidance favours neutral and soft tones and says bright colors, dark colors including black, and metallic colors will not be considered. Front doors and shutters may be brighter if they complement the rest of the exterior. Interpretations change over time, so check before you fall in love with a color.
It depends on what you are doing. Construction and modification of docks and shoreline structures on TVA reservoirs generally requires a TVA Section 26a permit, and the POA requires a permit for docks and seawalls as well. Replacing worn decking boards in kind is a different situation from enlarging or rebuilding. Tell us what you have in mind and we will be straight with you about where it falls.
Algae. A dock sits in constant humidity with sun beating off the water, and a thin biological film builds on the walking surface long before the timber itself is finished. A proper wash usually solves it. If the boards are also soft, cupped or splitting, washing will not fix that and we will say so.
No. Estimates are free and there is no obligation. We come out, look at the actual project, and give you a written price.
Start early — the ACC needs applications ten days before it meets. Call (865) 291-7089 and we will work back from your approval date.